The difficulty of design was to bring together these different activities in one building. For security reasons, it was planned to install elevators separate batteries for each assignment. Only the lobby is shared by different users.
Client: GeriaMinistère Luxembourgeois de la Santé
Study: 1993 - 1995
Construction: 1995 - 1997
Area: 9.050 m²
Cost: € 17.104.653,00