Phase 1: Construction of B-concourse with 40 boarding gates and connexion to the public transport. Phase 2: Construction of A-concourse with additionnal 31 boarding gates. The building is conceived for possible future extension and is 800 m long. The connexion with the terminal building is made via an underground passage way 500 m long located under the runway.
Client: BIAC Brussels InternationalAirport Company
Study: 1990 - 1994
Construction: 1994 - 2002