Maison de Soins et de Réadaptation

G.D. Luxembourg

The difficulty of design was to bring together these different activities in one building. For security reasons, it was planned to install elevators separate batteries for each assignment. Only the lobby is shared by different users.

Read more about this project

Client: GeriaMinistère Luxembourgeois de la Santé

Study: 1993 - 1995
Construction: 1995 - 1997
Area: 9.050 m²
Cost: € 17.104.653,00

<< Previous work Next work >>